General Mass Making was used next to create key forms which could be used within the area to maximize the use space while still maintaining key paths of travel throughout the site.
The next step was to start looking at the space available and locate the areas which would the most beneficial for each room/space depending on its inter-connectivity levels.
What follows is a general layout of areas spread across the 3 levels.
No comments:
Post a Comment